Fabrication Packs Generated in
Minutes Instead of 100s of Hours.
Complete fabrication packages — P&IDs, ISOs, SLDs, block diagrams, LDTs, instrument indices, and bills of materials — generated automatically from your engineering drawings. What costs $20,000+ per package manually now takes 12 minutes and a fraction of the cost.
Book a DemoThe Fab Pack Your Team Spends Months Assembling - In Minutes.
Manual fab pack generation requires senior engineers spending weeks per package — drafting P&IDs, generating ISOs, building LDTs, compiling BOMs, and cross-referencing everything. Artisan reads your engineering drawings and generates the complete package automatically.
Complete Packages, Not Partial Outputs.
Complete Package Generation
Artisan generates every artifact in a fabrication package — piping and instrumentation diagrams, line designation tables, instrument lists, bills of materials, shutdown keys, and isometric drawings with weights. Not partial outputs. The complete package.
Multi-Format Output Assembly
Combines 1D data (Excel), 2D deliverables (DWG drawings and PDF outputs), and 3D model data into a single, structured deliverable. Each artifact is automatically assembled and cross-referenced across disciplines, eliminating the manual effort of collating hundreds of documents from multiple engineering teams and formats into a cohesive, client-ready package.
Manifest & Completion Checks
Validates every fabrication package against a predefined manifest before release, ensuring no missing drawings, lists, or documents across all disciplines. Each artifact is cross-checked for presence, naming compliance, and format correctness — catching gaps that would otherwise surface during client review or on the fabrication floor.
Templating Management
Supports standardised designs with multiple configurable options per module, automatically generating the correct drawing variants based on project-specific selections such as IVC location, vendor skid sizing, and equipment configuration — delivering facility-specific packages from a single reusable template library.
Package Generation Order Management (Including Stamping)
Manages the end-to-end order lifecycle from sales entry through package assembly, automatically applying client logos, EPC stamps, and naming conventions via rules-engine-driven scripts — replacing the manual, error-prone process of stamping and assembling hundreds of drawings per order.
Integration With Project & Sales Management Workflows
Connects directly into EPC project and sales pipelines, carrying forward client name, generation, options, and sale status from the initial sales entry through approval gates and into automated package generation — ensuring every fabrication order is traceable from commercial intent to delivered package.
Fabrication Package Contents
Process
- Piping & Instrumentation Diagrams - Line Designation Table - Instrument List and Bill of Materials - Shutdown Key
Electricals & Instruments
- Junction Box Layout Drawings - Electrical Schematic Diagrams - I/O Termination Drawings - Single Line Diagrams - Cable Schedule - Instrument / Electrical Logic Diagram
General Arrangement Drawings
- /w Dimensional Outline and Weights - Electrical GAs
Isometric Drawings With Bills of Materials and Weights
- Butt Welded Pressure Piping ISOs - Socket Welded Pressure Piping ISOs - Threaded Pressure Piping ISOs - Heat Trace ISOs
Structural Drawings With Bills of Materials and Weights
- Ladder Drawings - Pipe Support Drawings - Platform Drawings - Skid Drawings
Building Schedules and Quality, Inspection & Test Plan
- Building Schedule Drawings - Construction Sequence Plans - Inspection & Test Plans - Quality Control Checklists
"Every week your fabrication team waits for a manually assembled fab pack is a week your construction schedule doesn't move forward. 198 artifacts in 12 minutes means your project timeline is no longer getting delayed by engineering deliverable production."
Frequently Asked Questions
Common questions about fabrication pack automation.
Ready to Generate Fab Packs in Minutes Instead of Weeks?
Send us your engineering drawings. See a complete fabrication package generated from your own ISOs and P&IDs — 198 artifacts, 12 minutes, construction-ready.
- Generate complete fabrication packages — 198 artifacts in 12 minutes.
- Reduce fab pack cost to a fraction per package.
- Include every deliverable — piping, electrical, structural, QC plans.
- Your engineers validate. Artisan generates.
